Inside an area of environmental concern, a fence is statutorily 'development' under G.S. 113A-103 — and development requires a CAMA permit under G.S. 113A-118. What that means for your lot.

If the lot sits inside an area of environmental concern, yes — and the reason is a definitional one worth understanding, because it explains why the question is geographic before it is structural. North Carolina's coastal statute defines 'development' broadly, and a fence built inside an AEC lands inside that definition. This page walks through the definition, the permit requirement that hangs off it, and how to find out whether your lot is in one.

The details

Start with the word doing all the work. G.S. 113A-103 — 'development' includes construction of a structure — the construction or enlargement of a structure, excavation, filling, clearing as an adjunct of construction, even alteration of sand dunes, within an area of environmental concern. Note what is absent: a size floor, a material exemption, a 'it's only a fence' clause. The statute does not ask what the structure is made of or how many posts it has. It asks where it is, and a fence in an AEC is development the same as a house is.

Then the requirement that follows from the definition. G.S. 113A-118 permit required is blunt: every person, before undertaking any development in any area of environmental concern, must obtain a CAMA permit in addition to any other required state or local permit. Two things in that sentence deserve emphasis. 'In addition to' — the CAMA permit stacks on top of the town or county building permit, not instead of it. And 'before undertaking' — the permit comes before the posts, not after the inspector drives by.

The statute also built a fast lane, and most fence owners will use it. Minor development permits are issued by the city or county under the expedited procedure of G.S. 113A-121 where the locality runs an approved program — which on the Outer Banks it does, and CAMA permit for oceanfront / sound / canal projects is the county telling you where to start: applications are available at the Dare County Planning Office in Manteo, on the phone at 252-475-5849. A fence is a small piece of development, and the minor path is the one sized for small pieces.

Now the question the whole page turns on: is your lot in an AEC? That is a mapped boundary, not an opinion, and it is why the water proximity rule of thumb exists — oceanfront, soundfront, and canal lots are the ones the county flags for the CAMA question, exactly the category the county's own permit page names. The definitive answer is a map check at the Planning Office, and it is the first thing we do for any waterfront fence project before anyone talks materials.

One boundary case this page will name rather than blur: compliant sand fencing has its own treatment under the coastal rules, and dune fencing built to those specifications is handled differently from a privacy fence in the same sand. And whatever the CAMA answer, the dig itself still runs through the state locate system — notice 3 working days before digging applies to the post holes of a permitted fence exactly as it does to anything else.

Waterfront lot, fence in mind? Call us — we check the AEC status as the first step of the quote, and if the CAMA minor permit is part of your project, we prepare and file it.

On the record: G.S. 113A-103 — 'development' includes construction of a structure (N.C. General Statutes § 113A-103 — Definitions (ncleg.gov, retrieved 2026-09-17)) · G.S. 113A-118 permit required (N.C. General Statutes § 113A-118 — Permit required (ncleg.gov, retrieved 2026-09-17)) · CAMA permit for oceanfront / sound / canal projects (Dare County, NC — Building Permits & Inspections (darenc.gov, retrieved 2026-09-17)) · notice 3 working days before digging (N.C. General Statutes § 87-122 — Excavator responsibilities (ncleg.gov, retrieved 2026-09-17)) · G.S. 87-1 — $40,000 (N.C. General Statutes § 87-1 — 'General contractor' defined; exceptions (ncleg.gov, retrieved 2026-09-17))

Hand-verified 2026-09-17 against the primary sources named above; where a fact could not be verified it was left out, never guessed.

Talk to a fence builder pro in Nags Head

Free phone estimates for Nags Head, Kitty Hawk, Kill Devil Hills, Southern Shores, Corolla, Duck, Manteo, Wanchese, Manns Harbor, Rodanthe homeowners and property owners. Same-day and emergency calls welcome.